Goals
Conduct an onsite survey and requirements-gathering exercise for the existing PI System to assess the project environment and establish the basis for the P5 project scope.
Challenges
Assessing existing PI Systems across ADNOC Gas facilities, gathering requirements, and evaluating the system environment to determine infrastructure adequacy.
Solutions
EMI’s awarded scope includes a kick-off meeting, requirements gathering and system design, and detailed onsite surveys at ADNOC Gas HQ, BuHasa Plant, ASAB 0/3 and ASAB 0 Plant, ASAB 1/2 Plant, and the MAQTA Control Room. An adequacy report is included as a deliverable.
Results
The survey and report aim to document PI System findings, assess system adequacy, and establish project requirements. Confirm survey completion, report submission, and subsequent project decisions before reporting achieved results.
|
ADNOC Gas – Kent P5 Project Site SurveyEMI was awarded an onsite survey and requirements-gathering engagement for the ADNOC Gas Kent P5 Project in the United Arab Emirates. The scope focuses on reviewing the existing PI System environment across a number of ADNOC Gas facilities and locations. The engagement includes a kick-off meeting, requirements gathering, and system design activities, followed by detailed onsite surveys at ADNOC Gas HQ, BuHasa Plant, ASAB 0/3 and ASAB 0 Plant, ASAB 1/2 Plant, and the MAQTA Control Room. |
An adequacy report is included in the project scope to document the survey findings. The survey activities are intended to establish an understanding of the existing PI System environment and support the assessment of requirements for the project. The source scope does not specify further implementation activities or measured operational outcomes. Confirm the final survey findings and report status with the project team before publication.