Technology
Aveva
Industry
Petrochemical
Client
Al Masaood / ADNOC Borouge
Country
UAE
Goals
Support the PE4 and PE5 revamp through PI System integration, PI OPC Interface updates, and PI Vision graphics development, including the preparation and implementation of additional project-related signals.
Challenges
Assessing the existing PI System and FDIS server capacity and configuration, accommodating 3,872 additional PI tag signals, confirming PI OPC Interface modification and licensing requirements, and implementing the required graphics across the relevant units.
Solutions
The scope aims to extend PI System configuration for 3,872 project signals, update 50 existing and develop 20 new PI Vision graphics, and support implementation across four units. Confirm completion, SAT acceptance, and punch-list clearance before reporting achieved results.
Results
The planned deliverables are intended to extend the PI System configuration for the project signals and provide updated PI Vision graphics for the revamp scope. Confirm completion of implementation, SAT acceptance, and final punch-list status before publishing achieved results.
|
Al Masaood – ADNOC Borouge PE4 & PE5 Revamp ProjectEMI was awarded services for the Al Masaood – ADNOC Borouge PE4 and PE5 Revamp Project in the United Arab Emirates. The engagement covers assessment and modification of the existing PI System environment, preparation of additional project signals, and updates to PI Vision graphics. The project starts with a kick-off meeting, requirements gathering, and a detailed site survey of the existing PI System at ADNOC Borouge. During the survey, EMI’s scope includes checking the existing FDIS servers and their availability to accommodate 3,872 additional PI tags through the existing PI OPC Interfaces. The work also includes identifying required modifications and verifying licensing requirements against the final tag count. |
Offsite development activities include preparation of 3,872 tag signals for ADNOC Borouge, modification of 50 existing PI Vision graphics, and development of 20 new PI Vision graphics. Onsite implementation is planned across four site visits, with one visit for each of the four units. Activities include modifying the existing FDIS servers and PI OPC Interfaces to add the new tag signals, checking data flow for the tags, deploying the graphics, conducting Site Acceptance Testing, and clearing the punch list.
The project documentation scope includes an adequacy report, site survey report, Functional Design Specification, SAT procedure, and method statement. Final implementation and acceptance status should be confirmed before the Results section is published.
