Technology
Aveva
Industry
Oil and Gas
Client
ADNOC
Country
UAE
Goals
Kickoff, gather requirements, and design system architecture. Configure 270 PI tags via OPC interface. Develop and deploy 15 PI Vision graphics. Configure PI Asset Framework hierarchy for integration.
Challenges
Accurate configuration of 270 PI tags. Coordinating remote and offsite development. Meeting ADNOC and Schneider quality documentation standards.
Solutions
Detailed requirements gathering and system design. Configured and validated 270 PI tags on FDIS system. Developed 15 tailored PI Vision graphics. Rigorous testing and full documentation delivery.
Results
270 PI tags successfully configured and integrated. 15 PI Vision graphics deployed for improved monitoring. Seamless asset visualization via PI Asset Framework. SAT completed with full client acceptance.
![]() |
SE- ADNOC Onshore Jebel Dhanna Murban Crude Export ProjectIn 2025, EMI was awarded a contract through Schneider Electric to support ADNOC Onshore’s Jebel Dhanna Murban Crude Export project. The project focused on enhancing the existing FDIS system by configuring 270 PI tags, deploying 15 custom PI Vision graphics, and integrating the PI Asset Framework (AF) to improve real-time operational visibility and control. The team started with a comprehensive kickoff meeting and requirements gathering, followed by system architecture design tailored to ADNOC’s needs. The configuration of the PI tags utilized the existing OPC interface to ensure smooth data transfer to the PI servers. |
The PI Vision graphics were developed to provide clear and dynamic visualization, aligned with operational requirements. Key challenges included ensuring accurate tag configuration, synchronizing remote and offsite work to meet timelines, and delivering complete documentation that complied with ADNOC and Schneider Electric quality standards. EMI overcame these through meticulous system design, thorough testing, and close coordination.
The project concluded successfully with the integration of all 270 tags, deployment of 15 PI Vision graphics, and a fully configured PI Asset Framework hierarchy, enabling enhanced monitoring and decision-making capabilities. The solution passed Site Acceptance Testing (SAT) with full client approval and was delivered with detailed documentation for future use.
