Advance Petrochemical Co

Engineering & Marketing International
Technology

Aveva

Industry

Chemical

Client

Advance Petrochemical Company

Country

KSA

Goals

Conduct site survey and gather upgrade requirements

Configure up to 20,000 PI tags for critical process data

Replicate and deploy 250 PI ProcessBook graphics

Install and validate PI OPC HDA Interface for Level 3 data

Challenges

Managed tag configuration and graphics replication under tight deadlines

Ensuring uninterrupted data flow via new OPC HDA interface

Delivering effective client training within a limited timeframe

Maintaining high data accuracy and system reliability

Solutions

Conducted site survey and created detailed system design documentation

Configured 20,000 tags and accurately replicated 250 ProcessBook displays

Installed and configured dedicated PI OPC HDA Interface for critical data

Provided one-day training and completed successful SAT

Results

Upgraded PI infrastructure enhanced ESD monitoring and control capabilities

Improved data accuracy and visualization supported safer operations

Delivered project smoothly with positive client feedback

Confirmed system reliability through comprehensive testing and validation

Advance Petrochemical Company DCS ESD Upgrade

In 2023, EMI successfully supported Advance Petrochemical Company in Saudi Arabia by executing a comprehensive upgrade of their Distributed Control System (DCS) Emergency Shutdown (ESD) system. The project was aimed at enhancing process safety, operational efficiency, and critical data management across the facility. EMI began with detailed site surveys and requirements gathering to fully understand the existing infrastructure, safety systems, and process control needs. Based on these assessments, a thorough system design was developed, ensuring seamless integration with the upgraded DCS and the PI System.

The upgrade involved configuring up to 20,000 PI tags to capture critical process data accurately, replicating and deploying 250 PI ProcessBook graphics for enhanced visualization, and installing a dedicated PI OPC HDA Interface to ensure reliable Level 3 data acquisition. Each stage of configuration and deployment was carefully executed to maintain uninterrupted data flow and operational continuity. In addition, EMI provided focused client training to enable efficient operation and monitoring of the upgraded ESD system, empowering staff to respond effectively to critical events. Throughout the project, EMI addressed challenges such as managing a large volume of tag configurations and graphics replication within tight deadlines, ensuring accurate data capture and transfer through the new OPC HDA interface, and delivering practical training within a limited timeframe. These challenges were overcome through meticulous planning, robust testing, and the implementation of best practices in system design and project execution.

The project concluded with successful Site Acceptance Testing (SAT), confirming system reliability, data integrity, and improved process visualization. The upgraded PI infrastructure significantly enhanced ESD monitoring and control capabilities, increased data accuracy, and strengthened operational safety. EMI’s delivery also received positive client feedback for its thorough documentation, effective training, and smooth execution, marking the project as a critical success in advancing both operational excellence and safety standards at Advance Petrochemical Company.