Technology
Aveva
Industry
Oil and Gas
Client
ARAMCO
Country
KSA
Goals
Upgrade legacy PI Server to PI 2015. Implement High Availability (HA) system. Configure redundant OPC interfaces for four GOSPs. Develop 160+ customized ProcessBook displays.
Challenges
Live migration with minimal downtime. Ensuring failover and redundancy. Rapid development of numerous displays. Remote site coordination.
Solutions
Dedicated PI engineers collaborating with local engineers onsite. Configured redundant OPC interfaces. Established HA PI Server Collective. Developed tailored ProcessBook displays.
Results
Successful transition to modern, reliable PI System. Real-time, clear operator visualizations. Increased data integrity and system uptime. Strong collaboration ensured project success.
ARAMCO Shaybah PI System UpgradeThe Shaybah oil field, located deep within the Rub' al Khali desert, is one of Saudi Aramco’s most remote yet strategically vital upstream production sites. In 2015, EMI was hired to undertake a comprehensive upgrade of the PI System infrastructure that supports four Gas-Oil Separation Plants (GOSPs) at Shaybah. This upgrade was critical to ensure reliable, continuous data acquisition, storage, and visualization, which are fundamental to the safe and efficient operation of these complex facilities. The existing PI System was aging, and there was an urgent need to migrate to a more modern and robust platform to handle increasing data volumes and provide enhanced system reliability. |
![]() |
EMI’s role included not only the migration and upgrade of the PI Servers but also the implementation of a high-availability (HA) system architecture to eliminate single points of failure. This HA setup was designed to maintain system uptime even during hardware failures or maintenance, which is vital for uninterrupted plant monitoring and control. One of the major aspects of the project was configuring redundant OPC interfaces to connect with AIM OPC servers from each of the four GOSPs. This redundancy ensured that data would continue to flow smoothly even if one interface failed.
|
|
Ultimately, this upgrade resulted in a resilient, modern PI infrastructure that improved data integrity, operational transparency, and system reliability—empowering operators with the tools needed for better decision-making and reducing operational risks. The success of this project has set a foundation for ongoing digital transformation and continuous improvement at the Shaybah facility.