FP_3_ADNOC GAS_Habshan-35

PI Services

Engineering & Marketing International
Technology

Aveva

Industry

Oil and Gas

Client

ADNOC

Country

UAE

Goals

Gather requirements and design AF structure remotely. Configure 300 PI tags and implement 1,000 calculations. Deploy PI Vision displays and PI Datalink report. Support PI Web API installation and conduct training.

Challenges

Translating environmental needs into scalable AF hierarchy. Integrating PI Web API with ADNOC’s AEMS system. Managing large volume of tags and calculations. Providing remote support and testing within timelines.

Solutions

Remote kickoff and detailed requirements workshops. Developed robust AF hierarchy and validated calculations. Configured PI Web API for secure data exposure. Delivered remote training and completed SAT successfully.

Results

Comprehensive PI AF solution with 300 tags and 1,000 calculations. Improved real-time visibility and reporting for emission monitoring. Seamless integration with AEMS via PI Web API. Enhanced client confidence through training and thorough testing.

AVEVA-ADNOC Gas Processing

DAHS Requirement Emission PI Services
In 2025, EMI was awarded a project by AVEVA to provide PI System services supporting ADNOC HQ’s Air Emission Monitoring System (AEMS). The project focused on designing and implementing a comprehensive PI Asset Framework (AF) structure to cover environmental monitoring across the Habshan, Habshan5, and Ruwais sites. EMI configured approximately 300 new PI tags as attributes in the AF hierarchy and implemented 1,000 calculations and analyses following customer-specific logic to ensure precise environmental data handling.

To support integration with ADNOC HQ’s AEMS, EMI configured the PI Web API to securely expose critical data, enabling automated data sharing and compliance tracking. Visualization tools including two PI Vision displays and one PI Datalink report were developed to enhance real-time monitoring and reporting.

The project involved remote kickoff, requirements gathering, and ongoing support, including training sessions and Site Acceptance Testing (SAT) to guarantee full operational readiness. Despite the challenge of translating complex environmental requirements into scalable AF structures and managing extensive calculations, EMI delivered a robust, scalable, and maintainable solution that strengthened ADNOC’s environmental compliance and monitoring capabilities.